Multan Industrial Estate
Multan Industrial Estate phase I comprises of 743 acres which was developed in 1980’s, stands as back bone of industrial activities in the city of Multan. This well-planned and developed estate offers a conducive environment for various industries to flourish. It is located at a distance of about 15km south west of the Multan city in a strategic location, it provides easy access to major transportation networks, connecting businesses to domestic and international markets seamlessly through highways, dry ports and airport. In 2004, Government of the Punjab formally handed over the MIE to the PIEDMC in order to revive industrial activity and to upgrade infrastructure. PIEDMC provided modern infrastructure, including well-built roads, utilities, and robust supply chains, ensuring smooth operations for businesses within its premises. Whereas Phase II comprising 667 acres was developed by PIEDMC in 2006. It is facilitating a diverse range of industrial units, catering to a wide array of sectors, such as textiles, manufacturing, food processing, and more. Multan Industrial Estate is led by a Board of Management belongs to private sector representing various industrial segments of the estate. Overall, Multan Industrial Estate stands tall as a catalyst for economic progress, commendably contributing to the industrial development of the region while elevating its position in national GDP.
In 2004, the Government of Punjab (GoP) formally handed over MIE to Punjab Industrial Estates in order to revive industrial activity. An amount of Rs. 100 million was allocated by the GoP for up gradation of the infrastructure and the same amount was contributed by PIEDMC.
Multan Industrial Estate Phase-I Rehabilitation
PIEDMC board has approved the rehabilitation plan of the Multan Industrial Estate Phase-I. A decent budget has been allocated for sewerage, road infrastructure, security gates and other development works.
MULTAN INDUSTRIAL ESTATE PHASE-II
Encouraged by the response of up-gradation work in Phase-I, PIEDMC was assigned task of development of infrastructure work for Phase-II in September 2006.
It is located adjacent to Phase-I at a distance of approximately 17 km south west of Multan City. Phase-II spreads over an area of 667 Acres having 349 plots.
Multan Industrial Estate is led by a Board of Management belonging to private sector representing various industrial segments of the estate and the rest representing the Government.
TYPES OF INDUSTRIES
Following industrial zones have been established at SIE
Chemicals
Cold Storage
Dyeing & Printing
Food Processing
Ginning Factories
Packaging
Paper & Board
Pesticide
Solvent Oil Extraction Plants
Steel/Fabrication
Wheat Value Added
Wood Products
Plot Distribution
Small & medium entrepreneurs were focused, hence majority of plots are of sizes between ½ acre to 2 acre. However, there are some bigger plots to accommodate large industrialists as well.
0.5
Acre
83 Plots
1
Acre
115 Plots
2
Acre
16 Plots
3
Acre
3 Plots
4
Acre
8 Plots
5
Acre
2 Plots
6
Acre
17 Plots
Total
Acre
244 Plots
MASTER PLAN
Actual size may vary, prices are charged according to actual measurements
CONNECTIVITY
| Airport | 10km |
| River Chenab | 13km |
| Railway Station | 9km |
| Muzaffargarh | 25km |
| Lodhran | 76km |
| Dunyapur | 48km |
| Shujabad Road | 40km |
| N-5 Highway | 12km |
| Sher Shah Road | Infront of Estate |
| Grid Station | 132 KVA 4km |
LOCATION
CURRENT STATUS
| Water Supply | Tube Well System |
| Power Supply | WAPDA |
| Telecommunication System | Telephone Lines with Broadband wireless internet connectivity |
| Roads | Major and minor arterial roads, Utility corridors and sidewalks, Green belts and median for street lighting |
| Security | Secured Boundary Wall with controlled entry and exit with internal patrolling |
| Present Status | Fully functioning administrative and site office, Boundary wall completed Water distribution network with underground and overhead reservoirs, pumping station and generator house completed, Underground sewerage network completed, Laying of electrical distribution network and sub-stations is in progress |
| Project Master Plan | Image is attached (Click here to download) |
| NOC Status | NOC has been obtained |
LIST OF NEGATIVE INDUSTRIES
| Slaughter Houses | Brick Kiln | Livestock |
| Poultry, Hatcheries and Protein making | Sulpheric Acid Production | Tanneries Metal Smelters |
| Fertilizers | Explosives | Asbestos |
| Hazardous Dyes Manufacturing | Manufacturing of Inorganic Chemicals | Stone Crushing and Pulverizing |
| Hot Mix plants | Cement | Warehouse |
| LPG/RLNG Storage & Filling |
Application For Industrial & Commercial Land







